Team Analytics

Sprint-level delivery flow, collaboration health, and previous sprint movement.

Project

Selected Sprint

Review Coverage

33.3%

Approval Rate

100%

Lead Time

10m

Throughput

1

Collaboration Funnel

Average elapsed time between major PR lifecycle events.

Open to review request0m
Review request to review0m
Review to approval0m
Approval to merge0m

Previous Sprint Movement

Change vs SP5 R1 Mob App. Hover the ? icon to learn what each metric means.

Velocity

Velocity fell — 2 fewer story points completed than SP5 R1 Mob App.

-6.5%
Predictability

Predictability dropped — 355 items added mid-sprint.

-49.4%
PRs merged

Merge throughput slowed — 10 fewer PRs merged than SP5 R1 Mob App.

-90.9%
Avg PR cycle

PR cycle time shortened — PRs moved from open to merged faster.

-98.4%
AI adoption

AI adoption held steady compared with SP5 R1 Mob App.

+0%